Meteren is behind the dike
Dike ring 43, Betuwe, Tieler- en Culemborgerwaarden. 10 dike sections keep this area dry, together 245.2 km of dike, dune and dam. Calculated from the centre of Meteren.
View Meteren on the map Search for your own address
- Location
- Behind the dike
- Dike ring
- 43, Betuwe, Tieler- en Culemborgerwaarden
- Ground level in the centre
- 4.5 m above NAP
- Nearest dike
- 3.5 km
- Lowest point within 1 km
- 0.9 m above NAP
- Municipality
- West Betuwe
How high Meteren lies
The centre of Meteren lies 4.5 m above NAP, so roughly above sea level. Within 1 km the ground is nowhere below NAP; the lowest point is 0.9 m above NAP, the highest 7.7 m above NAP. The nearest dike of the dike ring, section 43-6, lies 3.5 km to the south.
The dikes of dike ring 43, Betuwe, Tieler- en Culemborgerwaarden
The dikes, dunes and dams that keep this area dry, nearest first.
| Section | Distance | Standard per year | Assessment 2017–2023 |
|---|---|---|---|
| 43-6 Waterschap Rivierenland | 3.5 km 46.9 km long | 1 in 30,000 by law 1 in 10,000 | D: far from strong enough by law |
| 43-1 Waterschap Rivierenland | 10.0 km 15.9 km long | 1 in 30,000 by law 1 in 10,000 | D: far from strong enough by law |
| 43-2 Waterschap Rivierenland | 11.2 km 34.0 km long | 1 in 10,000 by law 1 in 3,000 | D: far from strong enough by law |
| 16-5 Waterschap Rivierenland | 11.4 km 24.8 km long | 1 in 0 by law 1 in 10 | C: not strong enough by law |
| 43-5 Waterschap Rivierenland | 12.5 km 22.5 km long | 1 in 30,000 by law 1 in 10,000 | D: far from strong enough by law |
| 16-4 Waterschap Rivierenland | 13.4 km 19.6 km long | 1 in 30,000 by law 1 in 10,000 | D: far from strong enough by law |
| 16-1 Waterschap Rivierenland | 21.1 km 15.1 km long | 1 in 100,000 by law 1 in 30,000 | D: far from strong enough by law |
| 43-4 Waterschap Rivierenland | 31.6 km 25.8 km long | 1 in 30,000 by law 1 in 10,000 | D: far from strong enough by law |
| 43-3 Waterschap Rivierenland | 34.9 km 25.4 km long | 1 in 30,000 by law 1 in 10,000 | D: far from strong enough by law |
| 47-1 Waterschap Rijn en IJssel | 43.5 km 15.4 km long | 1 in 3,000 by law 1 in 1,000 | C: not strong enough by law |
Of the 10 sections of dike ring 43, Betuwe, Tieler- en Culemborgerwaarden, the national assessment found 10 not strong enough.
What the standard means
Since 2017 every primary dike has had a standard: the highest chance of a flood per year it is allowed to give. The first figure is the signalling value, the safe margin. The second is the lower limit set by law. A+ and A meet the signalling value, B only the lower limit, C and D not even that. Not strong enough doesn't mean the dike will break tomorrow, but it does mean it has to be reinforced.
Your own address
Search for your own address to see your own street: you'll also see a cross-section of the nearest dike, the dike ring on a small map, the height around you, and what happens if you breach the dike.
Nearby
Geldermalsen dike ring 43, 4.1 m above NAP Est dike ring 43, 5.7 m above NAP Tricht dike ring 43, 4.7 m above NAP Buurmalsen dike ring 43, 5.1 m above NAP Neerijnen dike ring 43, 4.1 m above NAP Deil dike ring 43, 2.6 m above NAP Waardenburg dike ring 43, 3.8 m above NAP Opijnen dike ring 43, 4.0 m above NAP